Keraklan ing lapad ning cross section 2.5m, 3.6m, 4.8m, 6.9m, 9m. Ing babo keraklan gagamit yang masonry type suspended roof a maki refractory bricks ampo splicing type hanging structure a maki aluminum silicate fiber modules. Ing kaba ning kiln cart makatuglung ya agpang keng produktu
Istruktura da reng Tunnel Kilns:
1. Ing tunnel kiln keraklan atin yang makatuking bage:
(1) Ing peka-istruktura nang dake ning tunnel kiln, keraklan metung yang makaba a dalan a maki riles o rollers kilub para suportan at i-move la reng berding ladrilyu.
(2) Ing mumunang zona nung nukarin la lulub deng berding ladrilyu kaybat dang linub keng katawan ning kiln, nung nukarin ing temperatura bagya-bagya yang daragul para milako ing danum kareng ladrilyu.
2. Firing Zone: Ing core area ning tunnel kiln, a maki matas a temperatura, nung nukarin la mi-sinter deng ladrilyu.
3. Cooling Zone: Ing zone nung nukarin deng mesira a ladrilyu papalamig lang bagya bagya angga na keng temperatura a masanting para keng pamagdiskarga.
4. Combustion System: Magbigay yang pali a kailangan para keng pamanyira, keraklan kayabe nala reng burner, fuel supply systems, ampo exhaust systems.
5. Ventilation System: Kontrolan ne ing airflow kilub ning kiln para siguraduan ing kumpletung pangasilab ampo pare-pareung pamikalat ning temperatura.
6. Drive System: Gagamitan de para ilipat la reng berding ladrilyu keng kiln, keraklan kayabe la reng motor, chain drive, o roller drive devices.
Prinsipyu ning Pamagobra da reng Tunnel Kilns:
1. Ing prinsipyu ning pamagobra ning tunnel kiln makabasi ya keng patuloy a paralan ning pamaglalang.
2. Deng berding ladrilyu makabili la kareng kiln cars, na lulub keng kiln body kapamilatan da reng tracks o rollers.
3. Deng green bricks bagya-bagya lang papainit keng preheating zone para milako ing sobrang moisture, ampo deng exhaust gases ibat keng kiln malyari lang i-recirculate para mas masanting ing thermal efficiency.
4. Deng green bricks miras la keng pekamatas a temperatura keng firing zone ampo ayari da ing sintering process.
5. Deng mesilab a ladrilyu bagya-bagya lang mipapalamig keng cooling zone angga na keng temperatura a masanting para keng pamagdiskarga.
6. Deng saken ning kiln patuloy lang kikimut keng kiln, atin lang bayung green a ladrilyu a lulub ampo deng fired a ladrilyu a magdiskarga, para mika patuloy a produksyun.

Pamamintu at Pamaningat kareng Tunnel Kilns:
Para makasiguradung masalese ing operasyun ampo ing makabang bie ning serbisyu da reng tunnel kilns, kailangan ing regular a pamag-maintain ampo pamag-ingat:
1. Regular meng inspeksyunan ing katawan ning kiln para kareng bitag, deformations, o aliwang damage, at ayusan mu la keng oras.
2. Linisan me ing combustion system parati, kayabe nala reng burner ampo reng fuel supply systems, para siguraduan ing kumpletung combustion.
3. Siguraduan na ing ventilation ducts ala yang sagabal ampo lawan ing normal a operasyun da reng bentilador.
4. Lawen ing operasyun ning drive system, kayabe nala reng motor, kadena, o roller drive, at lubricate at palitan la reng mesira nang bage king oras.
5. Regular mung i-calibrate ing temperature sensors ampo reng control systems para makasiguradung ustu ing temperatura.

Applications da reng Tunnel Kilns:
Deng tunnel kiln maralas lang gagamitan kareng makatuking larangan:
1. Industriya ning ceramic: Para keng pamag-fire kareng produktung ceramic antimo reng tile ampo sanitary ware.
2. Industriya ning ladrilyu ampo baldosa: Para keng pamag-fire kareng clay bricks, cement bricks, atbp.
3. Industriya ning salamin: Para keng pamag-fire ampo pamag-anneal kareng produktung salamin.
4. Refractory materials industry: Para keng pamag-fire kareng refractory bricks ampo aliwang refractory a materyales.
Technical Parameters
lapad ning kilub ning tunnel | katas ning babo ning kiln saken | aldo-aldong kapasidad | 10,000 brick firing fuel consumption |
2.4 m | 1.6~2 m | ≥80,000 pirasu | < 49X 10^6 KJ |
3.5 m | 1.6~2 m | ≥150,000 pirasu | < 49X 10^6 KJ |
4.6 m | 1.6~2 m | ≥200,000 pirasu | < 49X 10^6 KJ |
6.9 m | 1.6~2 m | ≥300,000 pirasu | < 49X 10^6 KJ |
Q: Kapilan ya mayari ining proyektung tunnel kiln.
A: Keraklan kailangan ing 1 bulan anggang 2 bulan para a-assemble ing firing tunnel kiln. Mas makatipid ya keng oras kesa keng karaniwan a tunnel kiln na keraklan 4 anggang 6 a bulan.
Q: nung mag order kami tunnel kiln keng kekang kumpanya, nanu ing serbisyung malyari mung ibie?
A: Malyari dakang dinan drying tunnel kiln drawing, atin mu namang padala keng engineer para mag install yang aseembly tunnel kiln ampo suportan daka anggang ayari mu la reng ladrilyu ibat keng kiln.